An information system for estimating, targetting and planning in small building firms

Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.

Abstract

This thesis outlines the basic problems relating to estimating, targetting and planning functions in small building firms and a possible solution. It was found that information for these functions was rarely integrated and was derived from different sources. It was therefore suspect in terms of accuracy. Four case studies were undertaken and the firms were investigated and analysed in terms of their logical and physical organisation and management systems. Their basic problems were the lack of control of costs, slow feedback of information, low labour productivity and a shortage of staff to carry out the administration work. A general model was derived from the four case studies and this was used to specify the problems in terms of detailed activities and data used. The general model was analysed to derive a prototype system which co-ordinated the data in the different functions by using production oriented, operations, each with a standard performance output. Database management techniques were then used to structure the data effectively so that the prototype system could be implemented using a standard database package on a micro computer. A standard database file of operations was built up for alterations, refurbishment and repair work. A number of estimates were generated and compared to identical ones prepared by hand. All related planning and targetting information was then prepared. It was found that taking off of estimates took a little longer but once completed much relevant planning and targetting information could be generated and feedback obtained. This was all directly related to the estimate due to the integration of the functions. The management information generated allowed better control of costs and outputs with little administrative effort.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: accuracy; building firms; estimating; feedback; integration; productivity; refurbishment; labour productivity; case studies
Index terms: repair, productivity, estimate, database, information system, integration, estimating, building firm, accuracy, prototype, labour productivity, management system, case study, package
Subjects: maintenance engineering, financial and cost management, management, contractual arrangements, professional development, data collection methods, modelling and simulation, information systems, data management, organizational analysis, organization
Topics: Business Strategy, Digital Applications, Site Management, Research Practice, Information Management, Procurement, Organizational Design, Cost Management, Engineering Principles
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here