Safety, hazard and risk identification and management in infrastructure management: A project overview

Campbell, J M and Smith, S D (2007) Safety, hazard and risk identification and management in infrastructure management: A project overview. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Abstract

Safety hazards within transportation based projects can lead to serious injuries to company employees and the general public alike. Risks associated with such hazards must be managed in order to reduce the possibility of accidents and lighten injury severity. It is also envisaged that such a proactive risk management scheme would return significant cost savings associated with a reduction in compensation claimants and breaches in health and safety legalisation. This paper presents the current progress of a 3 year PhD project at the University of Edinburgh set up to address the above situation. The project is funded by Carillion Plc and an EPSRC industrial CASE award. A case based reasoning methodology has been employed to create a prototype safety tool hosted via Microsoft Access program. The tool aids classification of work tasks using a system based on RIDDOR categories. The tool then searches a database to retrieve a selection of control measures / hazard mitigations that have been used in similar past work tasks. These suggested mitigations can either be accepted or declined by users and/or new mitigations can be added and uploaded to the database library for use in the next cycle.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: case based reasoning; risk management; safety; transportation
Index terms: compensation, cost saving, mitigation, risk management, methodology, program, risk identification, database, prototype, health and safety, legalization, infrastructure management, case-based reasoning, injury
Subjects: dispute resolution, risk assessment, legal systems, modelling and simulation, health safety and environment, financial risk, infrastructure engineering, software systems, research methods, economics, data management, health conditions and diseases, cognitive psychology
Topics: Risk Management, Health and Safety, Cost Management, Engineering Principles, Research Practice, Digital Applications, Legal Issues
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here