A methodology for making construction productivity comparisons

Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.

Abstract

This study provides a methodology for comparing productivity of different construction projects. A project level of analysis is presented as the best framework for analyzing construction productivity. The methodology applies fundamental concepts of productivity measurement at the firm level to a project environment. The major distinction for a project is the assumption of a time-labor trade off instead of the traditional capital-labor trade off. Nuclear power construction projects provide an example for the methodology. Due to the difficulty of measuring project duration, peak manning levels are used as a proxy for time. The results provide evidence of the relationship between project manning levels and productivity as well as such factors as the type of nuclear reactor, the mid-date of construction duration, and various measures of construction complexity. This study provides a methodology by which projects of a similar type can be compared. Construction productivity is difficult to measure due to a lack of standards for what constitutes construction inputs and outputs. There are a variety of construction products and a large number of construction operations. This has led to uncertainty regarding the published rates of productivity in the construction industry and in other industries. The methodology can be applied when the stated assumptions regarding capital and labor can be met. The methodology is useful for comparing final performance of project management at different sites and at different times. Two types of comparisons are discussed. The first assumes the absence of stochastic noise and uses the "best" project performance as the "frontier". The second type of comparison accepts the existence of noise and is simply the actual project productivity versus the productivity predicted by the regression equations. The method of comparison depends on the purpose of the analyst.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: complexity; duration; measurement; uncertainty; construction products; construction project; noise; nuclear power; standards; productivity; project performance
Index terms: nuclear power, complexity, construction product, construction project, methodology, evidence, productivity, construction operation, construction industry, duration, construction productivity, project management, project performance
Subjects: project controls, systems engineering, industry analysis, research methods, management, project management theory and practice, production management, operations management, economic analysis, construction operations, energy systems, evaluation and assessment methods
Topics: Project Management, Research Practice, Engineering Principles, Business Strategy, Site Management, Time Control
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here