Forecasting and risk analysis applied to management planning and control

Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.

Abstract

The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, ... (continues)

Item Type: Thesis (Doctoral)
Index terms: project management, implementation, acquisition, forecasting, project planning, risk analysis, cost model, methodology, integration, construction project, management planning, programme
Subjects: business, control systems, prediction and forecasting, financial and cost management, contractual arrangements, research methods, project management theory and practice, production management, project controls, organizational analysis, environmental hazards
Topics: Procurement, Sustainability, Cost Management, Business Strategy, Research Practice, Project Management, Time Control, Organizational Design
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here