Why deconstruction is not adequately considered in Portuguese building refurbishment

Couto, A and Couto, J (2007) Why deconstruction is not adequately considered in Portuguese building refurbishment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Abstract

In Portugal, the sustainability of construction has been looked into over the past few years, especially where quality, safety and natural/energetic resource-saving technologies are concerned. Now, there are studies under way whose purpose it is to lessen the quantity of debris that are by-products of the construction process. On the other hand, is known the enormous patrimony that is waiting to be rehabilitated, as many of these buildings are sorely in need of interventions. However the deconstruction process is practically unused and unknown. Deconstruction paves the way for the revaluation and reuse of construction materials and elements which would otherwise be treated as worthless debris and removed to storage spaces which are often not legally authorized to hold such materials. An interviewer opinion collected process has been carried out with a set of selected Portuguese construction process participants. Its aim was to present their view on implementation and viability of deconstruction as an innovative technique in the process of refurbishment, thereby contributing towards the economic sustainability of said process. The reasons why deconstruction benefits aren’t considered are also discussed.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: sustainability; refurbishment; deconstruction; reuse; waste management
Index terms: waste management, construction material, economic sustainability, construction process, implementation, Portugal, building refurbishment
Subjects: contractual arrangements, economic analysis, building materials, waste management, building construction, asset management, Geography
Topics: Sustainability, Procurement, Engineering Principles, Geographical Context, Business Strategy, Site Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here