A combination of cyclone and vert techniques for the management of construction projects

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. PhD thesis, Aston University, UK.

Abstract

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the ... (continues)

Item Type: Thesis (Doctoral)
Index terms: project evaluation, construction industry, site operation, cyclone, heuristic, network analysis, research and development, cost control, construction project, planning technique, production process
Subjects: financial and cost management, data analysis and analytics, operations management, urban planning, value management, climate science, risk assessment, industry analysis, research management, production management, manufacturing engineering
Topics: Governance, Sustainability, Risk Management, Project Management, Research Practice, Engineering Principles, Cost Management, Site Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here