SightPlan: an expert system that models and augments human decision making for designing construction site layouts

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.

Abstract

"SightPlan is an expert system that lays out temporary facilities on construction sites. It demonstrates how one can closely model the steps taken by a person performing layout design, and how interactive graphics combined with an expert system can augment human decision-making. This dissertation describes site layout practice and reviews the state of the art layout modeling. The work on layout modeling fits within the larger context of spatial reasoning and generic design, so SightPlan can be related to on-going research in other domains. SightPlan builds upon the domain-independent BB1 blackboard architecture and uses the ACCORD language for constructive assembly. Three SightPlan strategies are applied to two case studies of power plant construction (the Intermountain Power Project and the American 1 project). An early-commitment strategy models the way human experts conduct site layout and produces a layout solution that satisfies all constraints. A temporal strategy tests and validates the early-commitment strategy and extends it by explicitly representing and reasoning about objects over time. This allows the global site layout to be animated as a sequence of layouts over discrete time intervals. A postponed-commitment strategy takes advantage of computer capabilities by delaying commitments and then heuristically sampling possible positions to find several satisfying solutions. While these solutions meet hard constraints, they appear ""chaotic"" that is, a person viewing them is likely to introduce additional constraints. SightPlan can introduce such constraints at run-time, or a user of the SightView graphical interface can introduce such constraints interactively and feed that information back to SightPlan for further reasoning."

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: reasoning; expert system; site layout; case study; construction site
Index terms: case study, dissertation, modelling, sampling, construction site, strategy, commitment, power station construction, reasoning, site layout, decision-making, state of the art, expert system
Subjects: analytical methods, site logistics, psychology, work location, research dissemination and communication, data collection methods, data management, cognitive psychology, decision analysis, management, civil engineering
Topics: Organizational Design, Site Management, Digital Applications, Risk Management, Research Practice, Engineering Principles, Business Strategy
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here