The development of performance prediction and optimization models for bridge management systems

Jiang, Y (1990) The development of performance prediction and optimization models for bridge management systems. PhD thesis, Purdue University, USA.

Abstract

A major objective of a bridge management system is to assist highway programmers in making consistent and cost-effective decisions related to bridge activities on a systemwide basis. As part of an effort to develop a bridge management system for the Indiana Department of Transportation, a bridge performance prediction model and an optimization model for project selection were developed. The purpose of the performance prediction model was to find the relationship between bridge condition rating and bridge age. The performance curves, obtained by applying polynomial regression techniques, were used to predict the average condition of bridges at a given age. The prediction of future conditions of individual bridges was achieved by utilizing the theory of Markov processes. The optimization model was developed by using dynamic programming in combination with integer linear programming and Markov chains. The function of the model was to select bridge projects so that the effectiveness or benefit of a bridge system is maximized subject to the constraints of available state and federal funds over a given program period. The Markov chain model was incorporated into the optimization model to predict or update bridge conditions at each stage of the dynamic programming. One version of the model maximizes the systemwide effectiveness in terms of bridge structural condition weighted by traffic volume, bridge traffic safety index and community impact index. A second version of the optimization model combines the ranking and optimization techniques so that the results of ranking and optimization models could be compatible. The proposed models are described in this thesis, and the results are presented along with examples and discussions. The performance prediction and optimization models can be used to provide optimal solutions to systems with hundreds of bridges.

Item Type: Thesis (Doctoral)
Thesis advisor: Sinha, K C
Uncontrolled Keywords: optimization; highway; traffic; bridge management; programming; safety; linear programming; bridge
Index terms: management system, bridge condition rating, programming, program, performance prediction, linear programming, Markov chain, optimization technique, bridge project, effectiveness, dynamic programming, project selection
Subjects: mathematical modelling, value management, programming, asset management, infrastructure and transport systems, algorithms, software systems, performance management, management
Topics: Organizational Design, Quality Management, Digital Applications, Engineering Principles, Project Management, Research Practice, Business Strategy
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here