The design of project estimating systems

Mulekezi, L (1990) The design of project estimating systems. PhD thesis, University of Birmingham, UK.

Abstract

Ineffective estimating practices cause major problems within the construction industry, exemplified in common failures to meet project objectives. There is much scope for improving estimating practice throughout the industry, however, estimating techniques must be considered within the context of complex organisational environments.In practice there are many factors which influence the compilation and use of estimates. The thesis presents a holistic view of the project system by linking estimates of cost, time and performance and reveals a wide range of social and organisational pressures which act to influence estimating practice.In particular this research examines the application and management of risk contingencies in the cost, time and performance objectives, and provides a model to explain the effect of dependency between these elements. The project estimating system is central to the task of project management and the research shows that, in practice, estimates must be designed for a variety of purposes, which require different methods of compilation and interpretation. Findings resulting from an original research methodology, based upon an interpretative approach, broadly shift the boundaries of existing cost estimating theory and facilitate the development of a systematic framework for the design of project estimating systems. This framework may provide the construction industry with a basis for redefining current practice.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: cost estimating; estimating; failure
Index terms: boundaries, estimating, organizational environment, cost estimating, construction industry, estimate, project management, research methodology
Subjects: financial and cost management, property law, research design and methodology, industry analysis, sociology, project management theory and practice
Topics: Organizational Design, Legal Issues, Cost Management, Project Management, Research Practice
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here