Scott, S (1991) Project plans and record-keeping on construction sites in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Abstract
The main part of this thesis involves an investigation into the ways in which contractors and supervising engineers deal with the programme of works for their projects. A secondary strand concerns the problems of record-keeping, in particular the records needed to assess claims for delay. A final chapter is included to describe a new model for teaching the principles of CPM, which developed from the research. Little is known about the procedures adopted for specifying project plans, for checking them or for using them to assess contractual claims. By interviewing contractors and consulting engineers using a questionnaire, this area has been opened up and information obtained to allow sensible recommendations to be made. The problems of concurrent delay have been examined and new ideas as to how they may be dealt with put forward. Some of the procedures used for this section of the work are considered to be novel and original. In considering the problems of assessing delay claims, it soon became clear that an 'as-built' record of progress would be, most helpful, and a computer program to generate such a record has been written. The author is not aware of any such similar program. Finally, the model for teaching CPM is an innovation. it uses a recognized format, that of the time-scaled diagram, but adds another dimension in allowing the activities to move on the diagram within the logic of the network. Throughout this thesis, the capitalized forms of engineer and contractor (Engineer and Contractor) have been given special meanings. Two separate questionnaires were used: one for the professionals involved in contract supervision and one for those involved in the construction of the contract. The particular interviewees questioned using the first of these questionnaires have been described as Engineers and those questioned using the second questionnaire as Contractors.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | construction site; interview; record-keeping; site supervision; teaching |
| Index terms: | construction site, United Kingdom, meaning, consulting engineer, programme, interview, program, questionnaire, engineer, dimension, supervision, computer program, investigation |
| Subjects: | sociology, project controls, software systems, Geography, work location, health monitoring assessment and metrics, data collection methods, profession, control systems |
| Topics: | Roles and Professions, Health and Safety, Research Practice, Geographical Context, Project Management, Time Control, Site Management, Digital Applications |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here