Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers

Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.

Abstract

For many years the $5 billion U.S. elevator industry was dominated by seven major U.S. manufacturers. During the 1980s, three of these manufacturers were sold to foreign competition. This study sought to provide a clearer insight into two of the problems threatening the survival of the four remaining U.S. elevator manufacturers: (1)~pricing construction contracts in a declining market, and (2)~halting the loss of existing maintenance contracts. This dissertation begins with a brief history of the U.S. elevator industry. A critique of existing construction pricing (or bidding) models found in the current financial literature and in practice among the U.S. elevator manufacturers was undertaken. The probabilistic model, predominant in the literature, lacked practical guidance for incorporating the benefits of follow-on maintenance business (where profits for elevator manufacturers are most lucrative). In practice, U.S. elevator manufacturers have ignored the probabilistic model and have left incorporating future benefits of maintenance to the judgment of the bidder. The net present value (NPV) model, widely used in capital budgeting decisions, was proposed as the appropriate model for combining construction contracts with follow-on maintenance business. Use of the NPV model was demonstrated with a selection of fifty bids, taken from the files of a U.S. elevator manufacturer. Quantifying opportunity costs associated with pricing alternatives illustrated an important advantage of using the NPV model rather than probabilistic models, which measure only probabilities of winning the bid. A critique of current customer satisfaction/dissatisfaction literature focused on the importance of customer behavior and attitudes. A callback study, performed on more than five hundred elevators operating in the Baltimore/Washington, D. C. area, showed that although U.S. elevator manufacturers' maintenance proved superior to independent maintenance, customer perception to the contrary has apparently caused the loss of maintenance contracts. With respect to new equipment, design improvements made over the years have not improved elevator performance. U.S. elevator manufacturers have fallen far behind their Japanese counterparts.

Item Type: Thesis (Doctoral)
Thesis advisor: Conatser, G R
Uncontrolled Keywords: competition; market; equipment; bidding; budgeting; capital budgeting; maintenance contract; pricing; Japan; net present value
Index terms: competition, bidding, history, manufacturer, maintenance contract, United States, Japan, profit, budgeting, construction contract, customer satisfaction, bidder, survival, dissertation, pricing, judgment, net present value, critique, capital budgeting
Subjects: environmental science, bidding, economic analysis, architectural and construction history, research dissemination and communication, evaluation and assessment methods, contract type, dispute resolution, practitioner, market analysis, budgeting, financial management, maintenance engineering, service delivery, Geography
Topics: Legal Issues, Business Strategy, Cost Management, Research Practice, Geographical Context, Stakeholder Management, Roles and Professions, Procurement, Sustainability
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here