Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Abstract
Developing a realistic cost estimate is vital to the construction project at every stage of planning and construction. Construction costs have traditionally been estimated using two methods: (1) comparative estimating and (2) quantity-take-off estimating. There are inherent limitations in each process that restrict its usefulness in supporting engineering decisions in the early critical stages of project feasibility and design. Neither method is very suitable in forecasting the costs of one-of-a-kind, never-before-built facilities. A knowledge-based system is proposed and prototyped to enhance the construction planner's ability to clarify decisions and isolate the preferred course of design based on both engineering and cost decisions. The basic thesis of the model design is that techniques can be developed to relate construction project requirements to current cost data through accepted engineering practices in order to develop better cost estimates for initial budget and feasibility decisions--without detailed design documents. The modeling concept uses a knowledge-based system to integrate expert judgments, engineering criteria, safety codes, historical data, descriptive factors, and specific site conditions. The knowledge-based system is prototyped and applied, as a case study, to estimating the costs of the Walton County Convalescent Center. A nursing home provides an excellent case study because it demonstrates complex modeling interrelationships and the applicability of the knowledge bases to nonmilitary construction projects. The results of the model were rated against multiple measures of merit: accuracy, specificity, timeliness, and user friendliness. Under each measure, results strongly supported the knowledge-based parametric cost engineering models over traditional methods. The modeling method, with only general information of the facility requirements was within 2. 8% of direct costs and 6% of construction bid costs computed using traditional methods. This accuracy was achieved with less than one-thirtieth the man-hours required using traditional methods. Twenty-nine other accuracy data points comparing final to estimates resulted in an average of 7. 3% using the knowledge-based system compared to 23. 9% using traditional methods. The case study demonstrates the specificity and user-friendliness in exercising the expert system. In addition, six areas for potential future research are discussed.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Schaub, J H |
| Uncontrolled Keywords: | accuracy; direct costs; construction cost; construction project; estimating; expert judgment; expert system; forecasting; military construction; safety; take-off; construction planner; cost engineering; knowledge-based system; case study |
| Index terms: | documents, expert system, construction planner, decision-making, construction project, estimating, take-off, knowledge base, accuracy, nursing home, cost engineering, estimate, modelling, cost data, cost estimate, judgment, direct cost, case study, forecasting, project feasibility, military construction, knowledge-based system, construction cost |
| Subjects: | information systems, infrastructure and transport systems, decision analysis, data management, professional development, production management, economics, accounting and finance, quantity surveying, analytical methods, financial and cost management, prediction and forecasting, artificial intelligence, practitioner, dispute resolution, value management, data collection methods, construction type |
| Topics: | Legal Issues, Digital Applications, Cost Management, Research Practice, Project Management, Engineering Principles, Information Management, Risk Management, Roles and Professions, Construction Technology |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here