Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.
Abstract
The timely, efficient, and quality completion of highway projects partly depends on the selection of the appropriate work shift. Certainly there are advantages and disadvantages for both day and night shifts. Daytime operations are generally considered to be safer for both workers and motorists because of better visibility and a higher state of alertness. However, to accommodate the flow of higher daytime traffic volumes, work zone lane closures may not be possible--and the option to work during the night becomes a serious consideration. A highway project's characteristics may favor a particular work shift. Type of work, lane capacity, average daily traffic (ADT), work zone accidents, project duration, and project costs are some of the issues that may dictate shift times. This research is aimed towards the development of a decision model that will incorporate all the factors that may influence the selection of either a day or a night work shift. The process is based on a decision tree representing qualitative and quantitative factors, ranked in the order of importance. The shift selection methodology is similar to the human reasoning process and that is why a knowledge-based system approach has been chosen for this decision model. An expert system shell has been utilized to develop the knowledge base, which consists of IF-THEN logic rules. The rule-based knowledge structure also has the option to interface with an external traffic count database for the purpose of lane closure analysis. The model approach to work shift selection includes mathematical reasoning in the analysis of traffic congestion, vehicle accident numbers, motorist (user) costs, and project (owner) costs. The final solution offered by the knowledge-based system model consists of the recommended work shift, number of daytime lane closures allowed, user cost savings for a night shift option, and percent change in total owner cost for a nighttime alternative.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Ellis, R D |
| Uncontrolled Keywords: | duration; highway; traffic; expert system; project cost; owner; reasoning; knowledge-based system |
| Index terms: | expert system, methodology, knowledge base, reasoning, project cost, decision tree, highway construction, option, cost saving, duration, reconstruction, traffic congestion, database, owner, knowledge-based system |
| Subjects: | civil engineering, economics, research methods, project controls, data management, sociology, decision analysis, building construction, cognitive psychology, transportation engineering, information systems, artificial intelligence |
| Topics: | Cost Management, Research Practice, Engineering Principles, Stakeholder Management, Risk Management, Digital Applications, Time Control |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here