Modelling activity dependencies for building construction project scheduling

Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.

Abstract

Activity dependencies are used to represent an important part of the logic of a construction project schedule, for example, general construction strategy, the sequence of activities and their overlap. The research investigates the existence of these different dependencies within building construction project schedules. The findings form the basis for the development of a schedule preparation model with which a planner: prepares schedules using a domain specific approach; uses specific procedures to identify and create different activity dependencies, and applies tailored data structures to store characteristics of individual activity dependencies. The model is designed to exceed the capabilities of current scheduling techniques based on project networks and achieves this principally by representing the characteristics of each activity dependency class. The model is thus qualitative in its approach. A computer program was subsequently developed in order to test the feasibility of the model. Test results show that the model offers a significant improvement over conventional scheduling techniques by enabling feasible alternative schedules to be generated rapidly. Additionally, capabilities of the computer program show that the model provides a good foundation for managing the logic of schedules by the means of selective reports about activity dependencies.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: construction project; scheduling; activity dependencies
Index terms: modelling, building construction, planner, data structure, construction project, project scheduling, scheduling, project network, strategy, computer program
Subjects: analytical methods, project planning, operations research, building construction, production management, software systems, data science, profession, management, project controls
Topics: Project Management, Engineering Principles, Roles and Professions, Business Strategy, Construction Technology, Time Control, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here