Predicting consequential effects of construction project changes

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Abstract

Changes occurring during the construction phase of a capital project are inevitable. Change effects, especially change consequential effects, have adverse impacts on project performance and profitability. This research develops a modelling methodology to improve the process of change-order pricing, particularly in identifying potential consequential or ripple effects that occur during construction. The principal focus is on the propagation concept in change prediction. Identification and assessment of likely change impacts support project management in mitigation effects. The methodology builds upon network precedence scheduling by attaching a causal diagram to each project activity. The change pricing model measures cost and durations of change effects. To support this model, a Standard Template Diagram (STD) systematizes the information required for estimating duration of each work discipline. In addition, change cause-effect pairwise relationships and a knowledge-based system relating to planning intents and activities' attribute database are identified. A prototype computer model and example illustrate both the methodology inferencing mechanism and change propagation process. The example starts with several required construction changes. The model then determines a number of adverse effects associated with several project activities. Management response actions, such as activity acceleration, are proposed by the model. Project plans can be adjusted to manage changes more effectively and mitigate "ripple effects. " Predictions of final cost and schedule include all direct, indirect and consequential effects of the imposed changes. The example and prototype computer implementation demonstrate that this enhancement of a typical precedence scheduling allows, for the first time, a systematic prediction of the consequences of construction changes. Researchers should benefit from further development of the change propagation concept, as well as the standard template diagram concept.

Item Type: Thesis (Doctoral)
Thesis advisor: Ashley, D B
Uncontrolled Keywords: duration; construction phase; estimating; pricing; scheduling; knowledge-based system; project performance
Index terms: scheduling, prototype, construction project, methodology, mitigation, estimating, pricing, knowledge-based system, database, capital project, propagation, project performance, profitability, construction phase, implementation, modelling, duration, project management, acceleration
Subjects: engineering process, economic analysis, analytical methods, strategic project management, financial and cost management, project delivery, contractual arrangements, artificial intelligence, operations research, modelling and simulation, financial risk, project management theory and practice, production management, research methods, project controls, data management
Topics: Digital Applications, Time Control, Engineering Principles, Research Practice, Project Management, Cost Management, Business Strategy, Procurement
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here