A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document

Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.

Abstract

In the contemporary construction environment, the evaluation and processing of construction claims is of utmost importance. Unfortunately, the claims procedure established in the Contract Documents is often needlessly complicated and the Contractor's right to the Claim can be inadvertently waived by failing to comply with notice requirements. In the United States, a large percentage of the contracts for the construction of buildings utilize the documents developed by and distributed through the American Institute of Architects (A.I.A.). In most of these cases, the A.I.A. A201 General Conditions document applies. The claims-related provisions of this document were incorporated into a knowledge-based system that provides specific advice to a Contractor for the evaluation and processing of a construction claim. This interactive system, named "Claims Advisor", was developed by use of the Windows version of the expert system shell EXSYS Professional. The system evaluates the relative strength of the Contractor's claim and reminds the user of the applicable claims procedures, notice requirements, and time limitations. Since the system is totally interactive with the user, only that specific date relevant to the claim in question must be provided. The consultation initially identifies the applicable Contract Documents, then proceeds to the circumstances that lead to the claim, and finally guides the user through the claims processing procedure itself. Throughout the consultation, on-screen help is available to assist the user in providing the proper response(s) and to interpret the system's conclusions. A total of 21,702 discreet paths through the system's internal logic diagram is available to the user and in each case a specific course of action is recommended. During the investigation, seven typical construction cases were selected for evaluation by the Claims Advisor. In six of the seven cases, the system produced the same conclusion that was arrived at by litigation. In the remaining case, the system's result was opposite to that reached by the District Court, but identical to that reached by the Appeals Court. Potential users of the system include project managers and other construction personnel as well as construction educators and their students.

Item Type: Thesis (Doctoral)
Thesis advisor: Lutz, J D
Uncontrolled Keywords: personnel; construction claims; expert system; litigation; professional; United States; knowledge-based system; architect; project manager
Index terms: expert system, documents, contract document, window, construction claim, United States, personnel, construction personnel, architect, investigation, project manager, litigation, interactive system, knowledge-based system
Subjects: dispute resolution, data collection methods, profession, workforce, artificial intelligence, professional development, contractual condition, Geography, software systems, architectural elements, management, payment, data management
Topics: Roles and Professions, Information Management, Geographical Context, Research Practice, Contract Administration, Digital Applications, Design Practice, Legal Issues, Human Resources
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here