The effect of contract type and size on competitiveness in construction contract bidding

Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.

Abstract

Flanagan and Norman (1982b) examined the bidding performances of three contractors. In developing this study, the aim of this research is to demonstrate through statistical modelling that, in terms of competitiveness, competing contractors are influenced, to varying degrees, by contract type and size and that a competitiveness relationship exists between contractor size and contract size. Bidding behaviour between construction firms is regarded as the outcome of strategic management decisions undertaken in an economic setting. Contractors are seen to compete for construction work in a competitive environment made up of a series of market sectors, each containing an amalgam of contract types and sizes, while clients are viewed as initiators of the whole contracting process. Contractors are shown to respond to client demands by deciding on a strategic domain within which to operate, which contracts to bid for and, if opting to bid, the appropriate bid level. Two approaches to modelling competitiveness are offered. The first approach examines the relationship between competitiveness and variability in bidding and a four-way classification system of bidder behaviour is developed. The main goal of this work, however, is contained in the second approach, which uses multiple regression to construct a competitiveness model - a prediction equation relating bidder competitiveness (the dependent variable) to the independent variables of bidder (analysed individually and also grouped according to size), contract type and contract size. The regression model shows that differences in competitiveness are greater for different contract sizes than different contract types. The most competitive contractors appear to be those with a preferred contract size range. The results are inconclusive in providing evidence that large bidders are more competitive on larger contracts and vice versa.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: bidding; client; competitiveness; construction firms; contracting; contracts; multiple regression; strategic management
Index terms: multiple-regression, statistical modelling, construction firm, competitiveness, modelling, evidence, independent variable, construction contract, strategic management, bidder, construction work, dependent variable, bidding, regression model, variability
Subjects: bidding, evaluation and assessment methods, contract type, analytical methods, organization, market analysis, operations management, management, statistical analysis
Topics: Business Strategy, Engineering Principles, Procurement, Project Management, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here