Integrated bid preparation with emphases on risk assessment using neural networks

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Abstract

Construction estimating works as the basis for various strategic decisions regarding the preparation of bid proposals, procurement plans, various levels of schedules, and job cost control. Under the highly risky environment of the prevalent competitive bidding practice, preparation of realistic estimates pertaining to those management decisions has been a complex task that is often performed on an ad hoc and piecemeal manner. Conventional procedures and tools have proved inadequate to provide a structured decision aid that, under such environment, maximizes the contractor's chances of winning a job with maximum potential profit, and further generates practical baseline plans needed for job control to maintain this profit. Yet the situation has been translated into a high percentage of business failures, a high potential for claims, and at best a low profit margin in the industry. This research presents a methodology for an integrated cost estimation and bid preparation, with emphasis on the assessment of bidding risks and optimum markup estimation. The methodology utilizes available tools (algorithms, database management systems, and Al-based techniques) that can benefit from current industry practice and provide an adequate decision aid during bid preparation. The methodology facilitates integration among estimating, planning and scheduling, and bid unbalancing. It incorporates enhancements to the various functions that cover the quantitative aspects of an estimate including: direct and indirect cost estimation, planning and scheduling, and resource utilization. This enables detailed estimates of costs and durations to be generated for all the project tasks, with minimal redundancy and in less time. Such estimates also establish the baselines needed for efficient job control. For practicality, the methodology accounts for the qualitative (risk-related) factors that play a vital role in the preparation of competitive bid proposals (e.g., competition, market conditions, and contractor keenness for the job). The methodology utilizes Neural Networks, an Al-based technique that employs a learning mechanism and emulates the human ability to solve pattern recognition tasks similar to many problems encountered in construction. This technique is introduced as a new tool to the industry, incorporating several potential applications. A neural network model is designed and used to arrive at an optimum markup value that maximizes that contractor's potential profit and predicts the probability of winning the job at such level of profit, in response to the project risk pattern. The methodology then utilizes the data obtained through the detailed estimate to optimally unbalance the final bid, in an effort to improve the contractor's cash flow while maintaining his competitiveness. A PC-based prototype is developed to automate the bid preparation process and an example application is presented in order to demonstrate the effectiveness and practicality of the proposed methodology. The proposed integrated methodology contributes to current automation efforts in construction and its modular architecture allows for further enhancement and expansions. The developments made with respect to the markup estimation problem demonstrates the powerful capabilities of neural networks and the potential benefits of deriving analogy-based solutions to complicated construction problems that are characterized by high uncertainty. This approach could readily be utilized in other domains in construction management where solutions are based primarily on holistic analogy and traditional algorithmic solutions are inadequate.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: competition; competitiveness; duration; effectiveness; failure; market; market condition; uncertainty; indirect cost; automation; bidding; business failure; cost control; cost estimation; estimating; integration; learning; scheduling; neural network; probability
Index terms: effectiveness, competitiveness, risk assessment, automation, duration, estimate, indirect cost, resource utilization, estimation, database, unbalance, competition, management decision, cost control, methodology, construction estimating, integration, bidding, estimating, bid preparation, job control, management system, cost estimating, competitive bidding, scheduling, cash flow, business failure, pattern recognition, proposal, profit, redundancy, neural network, prototype, market condition
Subjects: economic and policy analysis, project planning, bidding, artificial intelligence, site logistics, economic analysis, analytical methods, financial and cost management, operations research, modelling and simulation, computer vision, automation and robotics, financial risk, financial management, management, performance management, research methods, decision-making and reasoning, cost management, market analysis, data management, project controls, organizational analysis
Topics: Human Resources, Quality Management, Digital Applications, Site Management, Organizational Design, Time Control, Project Management, Research Practice, Engineering Principles, Business Strategy, Cost Management, Procurement
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here