Reengineering construction planning systems

Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.

Abstract

The objective of this research is to develop contributions towards solving the following problem: Current models and criteria are insufficient for analyzing and improving the performance of construction planning. This problem is addressed by validating the following hypothesis: The performance of a construction planning system can be evaluated and improved. To evaluate the performance of a construction planning system, this thesis develops and applies a set of criteria for measuring plans quality failures. It also develops and applies a matrix for evaluating the effectiveness and efficiency of a construction planning system structure. To improve the performance of a constructions planning system, an integrated approach to modeling management systems is applied. This approach utilizes a set of descriptive tools that can be used to model construction planning systems, processes, and management responsibilities as well as communication channels. The application of this modeling approach to a construction planning system leads to the revelation of opportunities for improvement. As a result, a new design for the planning system can be developed and implemented. The application and benefits of the research's reengineering methodology and tools are illustrated in two detailed case studies. To cite some of the benefits achieved in these studies, the US Navy Public Works Center's field productivity improved by 36% and average project duration was cut by 55%. For Dillingham Construction, field productivity improved by 37% and project duration was cut by 20%.

Item Type: Thesis (Doctoral)
Thesis advisor: Ibbs, C W
Uncontrolled Keywords: duration; communication; construction planning; productivity; case study; failure
Index terms: integrated approach, management system, methodology, efficiency, case study, productivity, public work, effectiveness, duration, modelling, construction planning
Subjects: contractual arrangements, construction planning, analytical methods, data collection methods, project controls, management, performance management, research methods, infrastructure engineering
Topics: Procurement, Business Strategy, Research Practice, Engineering Principles, Organizational Design, Site Management, Time Control, Quality Management
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here