CPM/LOB: new methodology to integrate CPM and line of balance

Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.

Abstract

In 1963 the United States Federal Government established a Line of Balance Coordinating Committee to study LOB’s applicability and its ties with network scheduling. Ever since many researchers and practitioners attempted to integrate the merits of CPM and LOB in graphical, operational research, and activity-dominated network scheduling. Nevertheless, the obstacles were not truly eliminated in a simple and practical way that was good enough to be accepted and adopted by the construction industry. This work presents CPM/LOB, a new methodology integrating both methods in a network context. It is simple to comprehend and apply using available commercial CPM computer programs, and does not require elaborate training. The method overcomes the vulnerability of CPM to changes in the sequence of work and inability to maintain work continuity for the working squads of the repetitive activities. It introduces float into LOB and revives LOB by creating access to it by commercially available and popular CPM packages. Several additional features are introduced to facilitate the management of planning and control of repetitive projects, such as identifying and quantifying progress that contradicts network logic, evaluating the effect of discrete activities, and measuring the progress regularity on multiple large housing contracts as well as single and small repetitive projects. The principles of the method have been published in Journal of Constructing Engineering and Management of the American Society of Civil Engineers in September 1994. Its practical application on projects in Kuwait and the United States is demonstrated by three case studies.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: construction planning; critical path; Kuwait; line of balance; prototype development;USA
Index terms: Kuwait, methodology, practitioner, vulnerability, line of balance, United States, society, large housing, prototype, critical path, journal, civil engineer, computer program, construction industry, construction planning, network scheduling, repetitive project, package, case study, operational research
Subjects: modelling and simulation, operations research, construction planning, contractual arrangements, data collection methods, research dissemination and communication, profession, practitioner, environmental hazards, communities and social development, industry analysis, software systems, research methods, management, economic development, production management, Geography
Topics: Site Management, Time Control, Urban Studies, Digital Applications, Roles and Professions, Stakeholder Management, Sustainability, Procurement, Business Strategy, Engineering Principles, Project Management, Geographical Context, Research Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here