Construction labour productivity analysis and benchmarking: the case of Tanzania

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Abstract

This research aimed at investigating strategies for construction performance improvement in Tanzania. The research established that the Total Quality Management (TQM) philosophy provides a feasible long term performance improvement strategy. Benchmarking was identified as a tool for initiating and sustaining the TQM programme. Labour productivity was selected as the key construction performance indicator. A framework for labour productivity benchmarking was developed, on the basis of current mean productivity (CMP) and target mean productivity (TMP). Construction labour productivity at macroeconomic level and site level were also investigated. Analysis at macro economic level over a 25-year period between 1969 and 1993 indicated a continuous decline in productivity expressed in value added per person engaged. Site labour productivity was investigated for eight construction activities on 46 sites belonging to 23 different contractors. Two significant findings emerged in the analysis: first, the variability quantified by coefficient of variation was considerably higher than in similar studies elsewhere; and secondly the distribution was skewed to the left suggesting that productivity was low for most of the operatives. These characteristics were indicative of the productivity improvement potential in the Tanzanian building construction industry. A distribution modelling exercise established that Johnson SB distribution (with shape parameters, η=1 and γ=1) model well represented productivity distribution for most activities. From this distribution, it was established that about 85% of operatives productivity was below the median, which provided a basis for quantifying the potential for improvement. The benchmarking model established that there was an improvement potential of about 133%. This potential was verified through an opinion survey of operatives. Factors that influence operatives productivity were identified through an opinion survey. Factor related to motivation were ranked highest in the survey. Possible influence of various factors on productivity was quantified through regression modelling based on actual construction operation observations. This analysis indicated that productivity depended on productive time which is largely influenced by operative motivation, supporting the results of the opinion survey.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: benchmarking; improvement; labour; motivation; performance; productivity; questionnaire survey; Tanzania; total quality management
Index terms: performance improvement, construction labour, labour productivity, modelling, operative, variability, Tanzania, exercise, productivity, construction activity, construction performance, construction operation, variation, questionnaire, benchmarking, total quality management, building construction, strategy, philosophy, survey, regression modelling, motivation, programme
Subjects: psychology, performance assessment, construction operations, analytical methods, evaluation methods, data collection methods, health behaviours and lifestyles, practitioner, project controls, building construction, philosophical studies, statistical analysis, management, performance measurement, Geography, contractual condition
Topics: Research Practice, Geographical Context, Engineering Principles, Business Strategy, Health and Safety, Construction Technology, Roles and Professions, Quality Management, Human Resources, Contract Administration, Time Control, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here