Models of construction price determination: A comparative appraisal

Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.

Abstract

This study compares the neo-classical micro-economic theory with tendering theory in the context of price formation in the building industry. It examines the two theories and determins that while there are problems with the application of both theories, there are no a priori reasons why either theory should be inapplicable. After discussing the appropriate criteria for selecting between competing theories, the theories were compared on how well they explain and predict the impacts of changes in the level of activity in the market/industry, the distribution of tenders, the strategy for maximising profit, the winner's curse, the accuracy of estimates, the socially accepted price and adjustments to productive capacity. On all criteria the neo-classical model performed better than did the tendering theory. However, both theories have a non-falsifiable motivational core assumption. In addition, neo-classical micro-economics has a set of ceteris paribus conditions and tendering theory has a probabilistic outcome which in practice means that neither theory is falsifiable. Although it is therefore not possible to verify or falsify either theory, the assumptions used in the neo-classical theory are more realistic and clearly identify the domain of the theory, while the assumptions of tendering theory are such that the building industry is not likely to be part of its domain, and it is therefore not applicable to the industry. It is, however, possible to synthesise neo-classical micro-economics with elements of tendering theory into a neo-classical tendering theory that predicts the winning price, the probability of success with a given bid and the potential profit probability density function. This theory has distinctly neo-classical characteristics. The units of analysis are the firm and the market, not the individual tender or the industry. The profit maximising price is determined by market conditions. Tendering decisions are made in two stages. The objective in stage 1 is to assess if the winning tender will be sufficiently high to satisfy the aims of the tenderer. In stage 2 the objective is to establish a bid with a desired probability of being successful or the desired risk/reward ratio.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: accuracy; market; market condition; motivation; winner's curse; economic theory; building industry; tendering; micro-economics; probability
Index terms: tendering decision, appraisal, profit, motivation, accuracy, strategy, market condition, building industry, estimate, density, economic theory, price determination
Subjects: financial and cost management, analytical methods, economic analysis, psychology, economic and policy analysis, industry analysis, professional development, management, factor and component analysis, tendering
Topics: Human Resources, Urban Studies, Procurement, Information Management, Research Practice, Business Strategy, Cost Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here