Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.
Abstract
Information systems (IS) are widely recognized as being an enabler not only for effective project management, but also for better engineering and construction automation. In addition, dramatic advances in information technology in recent years have motivated the construction industry to look into better methods of utilization of innovative information systems, so as to improve productivity. As a comprehensive concept, in order to maximize the utilization of information technologies, computer integrated construction (CIC) has recently evolved to mean handling separate applications effectively. However, CIC is a very broad and strategic concept. Complicating CIC solutions are the dynamics of technology development and business requirements. It is difficult, therefore, to design systems that are based on the available technology, resources, needs, and benefits. This situation calls for an effective IS planning process for implementing the CIC concept, especially on a company level. Nevertheless, to date, there has been no logical, regimented effort to investigate the methodology for IS assessment in the construction industry. Therefore, the purpose of this research investigation is to propose an IS planning methodology for the construction industry. First, a comprehensive framework is developed so as to identify IS requirements and functions over the project life cycle. Measures and factors influencing information systems are then investigated. Finally, by using the framework, measures, and assessment tools, an IS planning methodology is proposed. The proposed methodology has been applied to a real-world case study. This case study serves as a company-wide validation model for the proposed methodology and reveals problems and valuable lessons for further consideration. Conclusions and recommendations are given.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Gibson Jr., G E |
| Uncontrolled Keywords: | automation; information technology; life cycle; productivity; case study; validation; information system |
| Index terms: | planning process, case study, life cycle, productivity, dynamics, investigation, automation, construction industry, project management, methodology, validation, technology development, information system, information technology |
| Subjects: | innovation and technology management, value management, computing systems, data collection methods, industry analysis, systems engineering, information systems, project controls, automation and robotics, project management theory and practice, professional development, management, research methods |
| Topics: | Time Control, Digital Applications, Research Practice, Project Management, Engineering Principles, Information Management, Business Strategy |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here