Optimized scheduling for repetitive construction projects

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

Abstract

An object-oriented model is presented for optimized scheduling of repetitive construction projects such as: high-rise buildings, housing projects, highways, pipeline networks, bridges and tunnels. The model provides a number of practical features, and incorporates newly developed algorithms for scheduling of repetitive construction projects including: (1) a resource-driven scheduling algorithm for repetitive activities; (2) an interruption algorithm; and (3) an optimization procedure. The scheduling algorithm identifies the scheduled start and finish times as well as the assigned crew for each unit of a repetitive activity. The algorithm provides a schedule that complies with precedence relationships, crew availability and crew work continuity constraints, and considers the impact of a number of practical factors commonly encountered during scheduling. The interruption algorithm generates feasible interruption vectors for each repetitive activity in the project and provides added advantage over available formulations that consider arbitrary user-specified interruption vectors. The optimization procedure is based on a dynamic programming formulation. Unlike available dynamic programming formulations, the present formulation is capable of incorporating cost in the optimization process, thus offering valuable support to project team members in minimizing the overall cost of the project. For each repetitive activity in the project, the present model assists the planner in selecting the optimum crew formation and interruption vector from a set of possible alternatives. As such, the model can be used to evaluate the impact of different project acceleration strategies (i.e. multiple crews, increased crew size, overtime policies, or additional shifts) on the overall cost. The present model is implemented as a prototype software system. The system is developed as a 32-bit windows application that supports user-friendly interface including menus, dialog boxes, and windows. A number of application examples are analyzed to illustrate the use of the model and demonstrate its capabilities. The model can be used as a decision support system for generating optimized schedules for repetitive construction projects. This should contribute to cost-effective delivery of constructed projects.

Item Type: Thesis (Doctoral)
Thesis advisor: Moselhi, O
Uncontrolled Keywords: decision support; optimization; project team; construction project; highway; highways; pipeline; tunnel; housing projects; programming; repetitive construction; scheduling
Index terms: programming, dynamic programming, repetitive construction, planner, tunnel, precedence relationship, window, prototype, strategy, high-rise building, decision support, scheduling, project team, construction project, pipeline, acceleration, housing project
Subjects: profession, operations research, infrastructure and transport systems, production management, algorithms, project delivery, programming, building construction, architectural elements, management, housing and residential development, modelling and simulation, decision analysis, construction type, project controls
Topics: Time Control, Urban Studies, Project Management, Construction Technology, Roles and Professions, Digital Applications, Engineering Principles, Design Practice, Risk Management, Business Strategy
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here