Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Abstract

The Delay Analysis Method (DAM) is a model for a computer program that includes a database, which lists possible delay factors that are repeatedly encountered at project preplanning. The DAM includes recommendations of various methods that can be used to avoid delays, or correct them, in order to reduce their impact on project delivery. The Total Project Management Delay Analysis Method (TPM-DAM) is considered the initial step toward a standardized project preplanning and it introduces a new dimension to the project management industry. It is a guideline that provides a method for owners and managers to plan and schedule projects and provides them with the ability to identify problem areas, or possible delays. This research developed a model diagram for Total Project Management (TPM) that is the "HOURGLASS" model. The TPM-DAM program is designed to extract scheduling and cost data from existing scheduling software and the data can also be a direct input by the users. Project preplanning is one of the most important phases in the life cycle of projects and this is true for most projects. With an adequate and organized effort during the preplanning phase, a more efficient and cost effective project should result. The type of projects that were evaluated in this research were construction projects. Public and private construction projects were compared, contrasted, and evaluated in order to determine the most effective project preplanning and development method. This research addressed the probable causes for delays in the early phases of project development and their impact on various project parameters such as schedule, cost, scope, and project team work performance, quality, and efficiency. Users should be able to develop cost and schedule control strategies based on the TPM-DAM program outcome. The research introduced a logical model that, when implemented, improves current industry planning and development processes and reduces overall project life cycle time and cost.

Item Type: Thesis (Doctoral)
Thesis advisor: Yates, J K
Uncontrolled Keywords: project team; life cycle; project delivery; scheduling; delay analysis; construction project; owner
Index terms: cost data, work performance, program, schedule control, scheduling, delay analysis, database, project delivery, construction project, life cycle, project team, manager, strategy, project management, efficiency, computer program, project development, dimension, owner
Subjects: management, software systems, accounting and finance, project controls, sociology, data management, performance management, practitioner, project management theory and practice, operations research, health monitoring assessment and metrics, operations management, project delivery, value management, production management
Topics: Health and Safety, Cost Management, Project Management, Time Control, Stakeholder Management, Business Strategy, Quality Management, Digital Applications, Roles and Professions, Procurement
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here