Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures

Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. PhD thesis, University of Notre Dame, USA.

Abstract

The research presented in this dissertation represents the first successful attempt at finding an optimal feedback control law for a particular class of stochastic control problems involving noisy measurements and optimization criteria based on the first two cumulants of an integral quadratic performance cost functional. For linear systems where the class of feedback controls is constrained to be a linear function of the optimal state estimate, we develop the Hamilton-Jacobi-Bellman formulation for the minimization of the second moment of the integral performance functional. We also develop the corresponding results for the minimization of the cost variance when the cost-to-go of the mean is constrained. We subsequently develop the corresponding differential equations which will generate the solution for the output feedback minimum cost variance control. In order to demonstrate the implementation of this theory and develop insights into the properties of these controllers, we present a simple example of the application of this theory to a single degree-of-freedom structural system. We also apply the theory to the case of the benchmark problem competition being conducted for an active mass driver system implemented in a scale model three story building at the Structural Dynamics and Control/Earthquake Engineering Laboratory at the University of Notre Dame.

Item Type: Thesis (Doctoral)
Thesis advisor: Sain, M K
Uncontrolled Keywords: competition; optimization; civil engineering; cost variance; feedback; measurement
Index terms: estimate, earthquake, competition, dissertation, implementation, minimization, dynamics, cost variance, laboratory
Subjects: algorithms, market analysis, financial analysis, research dissemination and communication, systems engineering, contractual arrangements, research management, environmental hazards, financial and cost management
Topics: Cost Management, Procurement, Sustainability, Engineering Principles, Research Practice, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here