Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems

Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.

Abstract

The most widely used bridge management systems (BMS's), at the present time, employ Markovian decision processes for preservation optimization and level of service analysis for assessment of improvement needs. Using this approach, coordinated network and project-level programs are developed using incremental benefit-cost analysis. Retrofitting to mitigate potentially damaging effects of natural hazards and extreme events, such as that from seismic events, are not considered in the existing systems. The development of a methodology to facilitate network and level planning and programming is pursued. The mathematical approaches utilized, assumptions made and constraints imposed by the current BMS paradigms are examined in depth. Predominant prioritization procedures, which form the basis for current seismic retrofitting programs, are examined and evaluated. Data requirements are compared to contributory factors identified through historical damage. Inventory-wide data limitations are identified and additional data collection requirements are outlined. Constraints on the output of seismic retrofitting modules are defined and viable alternative approaches for model development presented. Viable approaches include measure-value procedures and the development of a new risk-based methodology. The measure value approach is examined using constant, linear and categorical estimators. Significant variations were exhibited with the raw indices and the procedures were decomposed to enable a focus on vulnerability specific variables and parameters. Variations persisted in both the project and network-level results. Application of a more rigorous, quantitative approach was thus shown to be a preferred technique. A methodology based on component-level ground motion-damage relationships was developed. The component level damage relationships were defined empirically based on historical damage information and expert opinion. Retrofits were defined as modifiers to the relationship parameters, which enabled quantification of effectiveness, assessment of expected costs, and determination of benefits as expected impacts to the traveling public, bridge owning agency, and general population. The methodology is applicable for the development of budgetary requirements to reduce risks, for the prioritization of structures, and for integration into project and network components of predominant BMS approaches. Application is demonstrated using a sample data set from the California bridge inventory.

Item Type: Thesis (Doctoral)
Thesis advisor: Gaus, M P
Uncontrolled Keywords: hazards; optimization; population; bridge; inventory; bridge management; integration; programming; variations; cost analysis; quantification; retrofit; estimator
Index terms: extreme event, quantification, inventory, seismic risk, decision process, contributory factor, effectiveness, module, paradigm, level of service, management system, cost analysis, natural hazard, mitigation, estimator, vulnerability, programming, variation, integration, methodology, population, program, retrofitting, model development, agency
Subjects: analytical methods, financial and cost management, programming, profession, risk assessment, environmental hazards, organizational analysis, demography, decision analysis, measurement and scaling, sociology, contractual condition, inventory management, financial risk, education and knowledge transfer, architectural elements, management, renovation and retrofit, performance measurement, research methods, software systems, performance management
Topics: Contract Administration, Organizational Design, Supply Chain Management, Quality Management, Urban Studies, Digital Applications, Design Practice, Sustainability, Risk Management, Roles and Professions, Engineering Principles, Research Practice, Cost Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here