Abstract

This thesis describes the development of a descriptive mathematical model to determine the optimum position of a single tower crane. The objective function of the model is that of minimization of total travel time necessary to complete all movements from the installation of the crane until it is dismantled and removed. Previous models which have been developed to determine optimum crane selection and location are categorized as simulation models, expert systems and mathematical models and three particular models are credited as making contributions to the problem of tower crane location. However, the model developed here overcomes many of the deficiencies exhibited by these models. In developing a model to determine optimum tower crane location, the characteristics of the construction site in which it will be placed and those of the crane itself must be considered separately. The most challenging and significant problem is in determining the total number of movements which will occur during the time when a particular crane is installed on a particular site. The method adopted was the application of a linear programming technique, the Simplex Method. Once the (computer) model had been developed a wide range of simulations were carried out to see if any general truth concerning the optimum layout could be evinced. The result of these simulations demonstrated that there are potentially significant savings to be made, in terms of the time to complete all movements, by locating the crane in the optimum position rather than in one where the maximum time to complete all movements occurs. Typical savings were in the order of 30% but situations where the time savings were in excess of 100% and even 200% were not uncommon. The layout configuration was shown to have very little influence on the magnitude of the minimum time to complete all movements. And these optimum positions were found to consistently occur at the site perimeter, very often at the corners, whilst the positions associated with the maximum times were consistently located internally. However, when the cost implications of locating the crane at the perimeter, which necessitates the use of a crane with a longer jib than would be necessary were the crane located internally, were taken into account, it was shown that, in terms of cost benefits, the cheaper option is to use the crane with a short a jib as is viable for the purposes of reaching the points the crane is required to service, and locate the crane internally. Finally, neural networks were shown to have potential as a tool to predict optimum crane location, but further work is needed to produce a working model.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: crane placement; linear programming; mathematical modelling; prototype development; tower crane
Index terms: mathematical modelling, time saving, option, tower crane, linear programming, savings, configuration, expert system, placement, minimization, mathematical model, movement, construction site, neural network, prototype
Subjects: work location, modelling and simulation, analytical methods, economic analysis, artificial intelligence, mathematical modelling, health behaviours and lifestyles, decision analysis, data management, time analysis, systems engineering, maintenance engineering, algorithms, management
Topics: Engineering Principles, Risk Management, Digital Applications, Human Resources, Time Control, Site Management, Business Strategy, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here