The performance approach to construction worker safety and health

Haupt, T C (2001) The performance approach to construction worker safety and health. PhD thesis, University of Florida, USA.

Abstract

Accidents occur on construction sites around the world despite various occupational safety and health laws, rules, and regulations. There is an international trend away from prescribing compliance with safety laws toward a performance approach. Contractors are allowed flexibility to choose the means and methods to perform their operations safely. This study examines whether a performance approach is an effective and acceptable approach to improving safety and health on construction sites. The study has 5 main objectives: (1) to increase understanding of the performance paradigm and its application to safety and health in construction; (2) to determine the feasibility and acceptance of the performance approach as an effective alternative to previous prescriptive approaches to construction safety; (3) to develop a model based on the review of literature on the performance approach in construction and examination of existing international construction safety and health legislation; (4) to establish whether applications for variances to OSHA's prescriptive requirements would have been obviated by the performance approach; and (5) measure the level of knowledge of the top management structures of construction firms about the performance approach and their attitude toward its implementation in their firms. We reviewed the literature on the performance approach extensively. We studied applications for variances to OSHA's requirements. We used a self-administered questionnaire survey for the top management of 100 construction firms. This study showed that most of the sample population (78%) believed they understood the performance approach very well. Most (58%) preferred this approach. The areas of flexibility, support for innovation, and ease of introducing new materials were regarded as being most important. Top management (54%) drove major change. The demonstration of consistent and decisive personal leadership, introduction of appropriate training programs, and allocation of adequate resources were the most important actions for the successful implementation of the performance approach. The strongest predictor of worker participation was the importance of safety and health issues. Strong predictors of the actions that would be taken to implement the performance approach were implementation factors and position within top management.

Item Type: Thesis (Doctoral)
Thesis advisor: Stroh, R C
Uncontrolled Keywords: flexibility; population; construction firms; construction safety; construction site; compliance; innovation; leadership; legislation; participation; regulation; safety; training; construction worker; questionnaire survey
Index terms: construction safety, population, program, top management, questionnaire, regulation, construction site, survey, construction firm, legislation, compliance, construction worker, implementation, paradigm, occupational safety and health, international construction, variance
Subjects: work location, legal systems, contractual arrangements, organization, strategic management, data collection methods, practitioner, measurement and scaling, occupational health and safety management, demography, political science, environmental health, software systems, management, education and knowledge transfer, health safety and environment
Topics: Site Management, Organizational Design, Urban Studies, Digital Applications, International Construction, Roles and Professions, Governance, Business Strategy, Research Practice, Legal Issues, Procurement, Sustainability, Health and Safety
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here