Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Abstract
This work documents the efforts to gain wide understanding of the construction industry and its interaction with the federal government through active participation and analysis of the major phases of the construction process as an intern with a construction company. To experience procurement, pre-construction planning, and construction efforts, an internship was developed with a leading construction company offering design and construction services. The internship was conducted within the company's Federal Contracting Group office and at two separate field locations. During assignments as an estimator, project engineer, assistant superintendent, quality manager, and project manager, tasks were conducted to support eight internship objectives. These internship objectives focused on achieving practical knowledge of how a construction company operates to provide customer services in the areas of quality, budget, and schedule. The internship was geared toward military construction efforts and procurement methods. Through the course of conducting bid estimates, an understanding was obtained on how a construction company identifies, measures, and assesses risk, and how scopes of work are coordinated into a cost estimate. Checklists were expanded and risk simulation methods investigated to minimize risks with the bid estimating process. Construction management abilities were enhanced with exposure to field production, subcontractor management, material handling, and field documentation. The importance of safety in construction operations has gained increased attention and was a focus of the internship. Both owners and general contractors understood the importance of safe operations to the success of a construction project. While actively participating in quality control operations, a review was conducted of a general contractor's quality management operations. Existing templates, processes, and checklists were employed to conduct pre-construction planning and quality control responsibilities involved with concreting operations at the two field locations. Aspects of total quality management were evident in the execution of each project. Responsibilities through the course of this internship have led to improving project manager competencies. An opportunity also existed to investigate and analyze the military design-build proposal process. Concerns and initiatives with preparing proposals in response to design-build solicitations were identified and suggested approaches for contractors were developed.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Trejo, D |
| Uncontrolled Keywords: | procurement method; construction project; plates; construction planning; documentation; estimating; government; material handling; military construction; participation; quality control; quality management; safety; total quality management; estimator; owner; project manager; subcontractor; simulation |
| Index terms: | project manager, procurement method, project engineer, military construction, customer service, construction operation, owner, pre-construction, design and construction, subcontractor management, construction planning, quality control, interaction, estimate, quality management, cost estimate, construction industry, proposal, total quality management, manager, construction company, documentation, general contractor, documents, estimator, construction process, management practice, construction project, concreting, internship, estimating, subcontractor, material handling, exposure |
| Subjects: | building construction, sociology, behavioral psychology, quality assurance, infrastructure and transport systems, industry analysis, public and environmental health, management, professional development, contract management, production management, service delivery, financial and cost management, project delivery, evaluation methods, construction planning, product delivery, contractual arrangements, project planning, construction operations, organization, profession, practitioner |
| Topics: | Quality Management, Supply Chain Management, Project Management, Engineering Principles, Health and Safety, Procurement, Site Management, Contract Administration, Research Practice, Information Management, Cost Management, Business Strategy, Roles and Professions, Stakeholder Management |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here