The world turned upside-down: Architects as subcontractors in design-and-build contracts

Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Abstract

The traditional role of the Architect on UK building projects is well-known and has been the subject of much study and comment. However, recent surveys indicate that design-and-build arrangements now exceed traditional procurement in terms of their share of total UK construction. On such projects, architects and other designers are engaged, not by the employer, but under sub-contract to the main contractor. The question arises as to the effect this has had. This has been approached by considering architects and other design consultants as professional contractors, as opposed to trade contractors - a term adopted to describe the more traditional type of subcontractor. Within these distinctions there are contractual, managerial and cultural implications for the relationships between the parties. To explore this further, representatives of five main contractors were questioned on their relationships with the two types. Clear differences emerged in matters such as contract formation, price-setting, payment and claims; the treatment of selection, work scheduling, and defects / omissions was more complicated. Within trade contractors there is a strong argument for recognising a further category of specialist contractors, who include a design service in their work package. Within the professional contractor category, architects were clearly differentiated from other design team members. The findings are analysed to suggest a theoretical framework with four dimensions that relate to process/product, attitude/motivation, working culture and relative power. The concern is not to be definitive at this stage, but to suggest an agenda for future research into the issues that have emerged.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: architect’s role; design-and-build contract; professional contractor; relationships
Index terms: specialist contractor, architect, dimension, contract formation, subcontractor, trade contractor, main contractor, scheduling, package, design team, traditional procurement, motivation, designer, survey
Subjects: health monitoring assessment and metrics, contractual arrangements, professional practice, operations research, psychology, contract formation, practitioner, profession, data collection methods
Topics: Health and Safety, Research Practice, Roles and Professions, Procurement, Design Practice, Human Resources, Contract Administration, Time Control
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here