Analysing and predicting falsework failure in Hong Kong

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Abstract

Falsework is a temporary structure supporting the permanent structure while it is not self-supporting. Falsework is commonly required in concrete construction which involves a number of parties such as the design engineer, contractor, subcontractor, supplier and checking engineer. In the past, many failures occurred due to procedural inadequacy such as confusion in responsibility delineation and communication. In Hong Kong, during the last six years, at least eight major falsework collapses have been reported. Researchers studying falsework failures have devised models for analysis and prediction. However, procedural inadequacy has not been adequately considered and assessed in these models. Further, these models were mainly used to predict the likelihood of eventual failure at loading stage without evaluating the safety condition at various stages of falsework construction. The overall aim of this thesis was to develop a procedural framework that can be used to assess the proneness to failure at different stages of constructing falsework in Hong Kong, thus, warning can be given promptly. The objectives of the research were: to review the practices of falsework scaffolding; to compare the different control systems on the design and construction of falsework; to analyse the causes of falsework failures; and to develop a procedural framework for assessing the safety of falsework at various stages. To identify the causes, 50 failure cases were analysed. Nine site visits to Hong Kong, Macao, China, Taiwan and Singapore, where falsework failures occurred, were made. A total of 33 tests of falsework scaffolding materials were performed in the laboratory. A procedural framework based on balloon theory was developed to assess the procedural errors for analysing and predicting falsework failure. The research yielded the following outcomes: the identification of causes, frequency and impacts of falsework failures; the classification of the key and critical activities of falsework under the five essential stages, i.e. design, erecting, loading, dismantling and anew; recommendations on the loadbearing capacity of the new and used falsework scaffolding material; the graphical presentation and assessment of the procedural errors accumulated throughout various stages; the flowchart, showing the role of various parties and the impact due to changes in the construction method of the permanent works and falsework, for analysing and predicting failures; and a procedural framework to analyse and predict falsework failures. Fifteen construction professionals confirmed that the procedural framework would be very useful in monitoring the performance of falsework as required under the latest Code of Practice for Metal Scaffolding Safety issued by the Labour Department of Hong Kong.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: analysis; collapse; design; fabrication; falsework; formwork; Hong Kong; prediction; process improvement
Index terms: control system, dismantling, concrete construction, subcontractor, China, laboratory, Taiwan, process improvement, construction method, scaffolding, design and construction, construction professional, falsework, monitoring, metal, fabrication, loading, Singapore, Hong Kong, engineer, formwork
Subjects: professional development, Geography, monitoring and control, traditional and composite building materials, manufacturing engineering, management, research management, building construction, control systems, practitioner, profession, construction operations, contractual arrangements, operations management, construction methods
Topics: Geographical Context, Engineering Principles, Procurement, Site Management, Business Strategy, Research Practice, Construction Materials, Information Management, Roles and Professions, Construction Technology
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here