An integrated analytical approach to environmental management in construction

Chen, Z (2003) An integrated analytical approach to environmental management in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Abstract

A remarkable difference between the registration rate of ISO 14001 environmental management system (EMS) and the implementation rate of environmental impact assessment (EIA) in construction industry in Mainland China indicates that there may be little coordination between the implementation of the EIA and the EMS in construction projects in Mainland China, and the EIA practice may not really serve as a tool to promote environmental management (EM) in construction. Since the China Environmental Protection Bureau recently enacted to implement the environmental supervision system in construction project supervision, contractors have to pay greater attention to adopt and implement EM in construction. In this regard, this thesis presents an integrative methodology named E+ for dynamic EIA in construction, which integrates various EM approaches with a general EMS process throughout all construction stages in a construction project. The EM approaches integrated in the E+ include an analytical approach of construction pollution index named E+ Plan CPI, an analytical approach of environmental-conscious construction planning named E + Plan Environal Planning, an analytical approach of incentive reward program for material management named E+ Logistics IPR, and an analytical approach for waste material exchange named E+ Logistics Webfill. The E+ is expected to effectively and efficiently assist contractors to enhance their both EIA and environmental performances not only in Mainland China but also in other areas.

Item Type: Thesis (Doctoral)
Thesis advisor: Li, H and Wong, C T C
Uncontrolled Keywords: coordination; construction project; construction stages; construction planning; environmental impact; environmental management system; logistics; material management; pollution; supervision; China; environmental impact assessment; environmental performance
Index terms: environmental performance, waste material, pollution, environmental impact assessment, construction industry, implementation, construction planning, supervision, environmental management, coordination, construction stages, ISO, environmental management system, environmental protection, methodology, program, construction project, construction project supervision, environmental impact, China
Subjects: environmental health, environmental engineering, industry analysis, production management, Geography, software systems, research methods, management, sustainability assessment, project delivery, construction planning, environmental science, contractual arrangements, standards development, control systems, environmental impact
Topics: Procurement, Sustainability, Project Management, Geographical Context, Quality Management, Research Practice, Site Management, Organizational Design, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here