Co-ordination of building services and procurement methods for highly serviced buildings

Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.

Abstract

This research explores the impact of both traditional and non-traditional procurement methods on the performance of the management of building services integration and coordination in Hong Kong and other countries. It examines those variables thought to be present in the building services co-ordination process (within the building process) which influence the performance of the building team and the outcome of the building project. Five propositions are addressed by the work which are: (1) coordination of services is influenced by the management of design; (2) coordination of building services is influenced by the management of construction; (3) coordination is not only a technical issue but an exercise in management. It is also influenced by the construction professional’s working practices; (4) coordination of services is influenced by the chosen project procurement method; (5) project success is influenced by effective building services co-ordination and the use of an appropriate procurement method. The problem of determining an appropriate procurement method for the management of a building services integration and co-ordination has been surrounded by controversy and strongly held opinions. The work reported here attempts to indicate some rational basis for choice in this decision by identifying those factors which significantly affect project performance, with particular reference to the distinctions between traditional and non-traditional procurement methods. Modelling of the management of the co-ordination process based on rich data gathered from surveys and pilot studies help the development of two research models for this research. Case studies are then analysed to explore the co-ordination process in a real life situation. The variables given in the models and the propositions are tested. Analysis of 25 case studies and the survey results suggest that co-ordination of building services can be affected by both technical and managerial issues as well as the organizational structure selected for a complex project. The results from this research support the argument that successful co-ordination can be as readily achieved by a traditional building team as by a fully integrated design and construction organization. The conclusion to be drawn is that procurement form is not a good predictor of performance. Moreover, procurement method is not the only variable affecting project performance, rather the combined effect of a number of variables is the major determinant In general, the level of managerial control is found to be more strongly associated with performance. Specifically, the factors of quality of design and co-ordination of services, integration of the building team, management of site co-ordination works and control of services contractors are found to affect more the performance of co-ordination of building services when the project is highly serviced.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: building services; case study; Hong Kong; integration; performance; procurement
Index terms: organizational structure, traditional procurement, complex project, project procurement, project performance, determinant, building process, coordination, survey, traditional building, integrated design and construction, exercise, modelling, case study, working practice, project success, procurement method, building service, Hong Kong, construction professional, building team, integration
Subjects: strategic project management, organizational analysis, analytical methods, management, contractual arrangements, professional development, health behaviours and lifestyles, data collection methods, leadership, Geography, risk assessment, construction integration, sociology, construction type, engineering systems, building construction, project management theory and practice
Topics: Research Practice, Business Strategy, Risk Management, Information Management, Engineering Principles, Organizational Design, Health and Safety, Construction Technology, Project Management, Procurement, Human Resources, Site Management, Geographical Context
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here