Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.
Abstract
The Line of Balance (LOB) method is not widely used in the construction industry even though LOB is the best fit for repetitive construction projects. In this research a tool named ALISS was developed that solves most of the problems associated with LOB applications. ALISS is an acronym for Advanced Linear Scheduling System and it aims to create a model that can utilize the tools of Information Technology to the fullest extent. This is accomplished by creating a system that is flexible enough to accommodate an Internet application. ALISS has two versions, namely a stand alone and a server version. It has also a web module for inputting data. ALISS is programmed using visual basic and visual basic script languages. It utilizes MS Access and SQL server as a data repository. ALISS utilizes a new learning model. An approach to formulate learning rates is proposed in this study that starts by identifying historical learning rates of typical construction activities and then adjusts them by including the impact of relevant factors such as number of operations in one unit, activity complexity and job and management conditions. In this process, the fuzzy set theory is used to develop production rules to treat both factual and uncertain information. Learning reduces project duration and overall resource requirements. The end product of the study presented in this dissertation is an advanced linear scheduling system that not only accommodates all LOB requirements but also provides the latest technological developments as an embedded tool.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Arditi, D |
| Uncontrolled Keywords: | complexity; duration; fuzzy set; construction project; information technology; learning; repetitive construction; scheduling; line of balance |
| Index terms: | information technology, complexity, linear scheduling, construction project, script, repetitive construction, scheduling, line of balance, dissertation, duration, construction industry, internet, module, fuzzy set, fuzzy set theory, construction activity |
| Subjects: | computing systems, research dissemination and communication, construction operations, operations research, production management, architectural elements, decision-making and optimization, industry analysis, systems engineering, project controls, building construction, sociology |
| Topics: | Project Management, Engineering Principles, Research Practice, Construction Technology, Design Practice, Digital Applications, Site Management, Time Control |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here