Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Abstract
Both the importance and process of estimating project construction time have increased in significance as roadway user costs themselves have become more significant. In estimating project construction times, beyond the process of synthesizing activity durations, few parameters are more significant than work item crew production rates. This research was initiated in order to collect reliable field data of crew production rates and to identify factors driving the rates, which will help TxDOT better estimate construction contract time. A data collection tool was developed incorporating many different factors affecting production rates for consistent data collection. A guideline was also established to ensure the accuracy and efficiency of the data collection process. Five critical work items of highway bridge construction, namely Footing, Column (Rectangle/Round), Cap, Beam Erection, and Bridge Deck, have targeted and efforts have been made to collect field data by means of observation from a large number of Texas ongoing projects. For the five work items, a total of 137 data points were acquired on 25 ongoing highway projects between February 2002 and January 2004. Production rates were compared with previously CTDS established rates. Rates of ‘Column-Rectangle’ and ‘Beam Erection’ in CTDS are much lower than the ones collected from this research. However, differences in the scope of each work item used for the production rates computation must be taken into consideration when the results are interpreted. Various hypothesized drivers of the crew production rates have been also analyzed. First, several candidate drivers were identified by visually inspecting on scatter plots as well as correlation coefficients tables. Then, Simple Regression and Analysis of Variance (ANOVA) were employed in order to test statistical significance. It was found that some of the drivers have statistically significant relationships with the production rates.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | O'Connor, J T |
| Uncontrolled Keywords: | accuracy; duration; highway; bridge construction; estimating |
| Index terms: | estimating, duration, construction contract, computation, accuracy, highway construction, estimate, efficiency, bridge construction, construction time, column, time estimation, beam, variance |
| Subjects: | performance management, computational methods, measurement and scaling, financial and cost management, civil engineering, contract type, operations research, professional development, project controls, structural engineering, infrastructure engineering |
| Topics: | Research Practice, Quality Management, Digital Applications, Time Control, Procurement, Information Management, Engineering Principles, Cost Management |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here