The effects of visual-based information logistics in construction

Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.

Abstract

The construction industry has, for sometime, suffered from stagnant productivity, high accident rate, project delays, and poor quality. Research studies have shown that the major cause of these performance problems is the lack of effective communication. This research was launched to investigate the usefulness of a comprehensive information logistics model on construction process performance. In order to test and validate key components of the model, a prototype network system named Visual-based Integrated Wireless Site (V-IWS) was developed and tested on a mid-size building construction project. The system was designed to allow every project participant access to real-time visual images of the jobsite and share information interactively with each other as well as with a central database through the Internet. It was developed and evaluated for 7 months in 2003. During the same time, the communication channels adopted by the general contractor, R. N. Rouse, and on-site meetings were observed and analyzed. This analysis indicated that most of the information shared among participants of this project could be handled electronically by the V-IWS. It was demonstrated that the V-IWS: (a) reduces production waste and non value-added activities such as material delivery time, (b) eliminate the need for unnecessary site visits and meetings, (c) adds significant value to project participants by automatically creating visual as-built and picture archives, (d) provides operational how-to training for crew, and (e) increases site safety and security through automated monitoring. The system is scaleable and more network devices can be added as the building grows. While this study proved technical feasibility of the V-IWS, it became evident that trust, collaboration and information sharing among participants were critical success factors. Due to the industry's traditional low-bid competition and aversion to change, it is crucial to understand how costs and benefits be distributed. Value sharing as well as technology adoption process need to be studied in order to ensure successful implementation of the system.

Item Type: Thesis (Doctoral)
Thesis advisor: Bernold, L E
Uncontrolled Keywords: competition; security; trust; construction project; collaboration; communication; logistics; monitoring; productivity; safety; training; critical success factor
Index terms: critical success factor, project delay, construction project, collaboration, construction process, competition, prototype, general contractor, building construction, construction industry, internet, implementation, technology adoption, monitoring, delivery time, information sharing, productivity, database
Subjects: modelling and simulation, innovation and technology management, contractual arrangements, control systems, practitioner, computing systems, data management, project controls, market analysis, building construction, industry analysis, time analysis, management, data exchange, production management
Topics: Organizational Design, Site Management, Time Control, Digital Applications, Construction Technology, Roles and Professions, Research Practice, Business Strategy, Procurement, Project Management, Engineering Principles
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here