Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.

Abstract

The primary purpose of this research is to develop systematic procedures, quantity models and an automated computing tool for highway estimating process for the Texas Department of Transportation (TxDOT). This study built a preliminary cost estimating system that toggles between project input information, predictive item-level quantity models, and segregated unit prices for highway work items. A computer application and a prototype web-based system both using relational databases were developed. The design concept of this automated system is to better exploit work item historical unit prices and initiate preliminary estimates with quantity-based models for later periodic quantity adjustment. This approach was chosen because of conventional approach lacking of quantity information until 90% to 95% design complete. This cost estimating system enables continuity of item-level quantity tracking as projects evolve to later phases. The output, in the form of a report can be uploaded to the TxDOT Design and Construction Information System for subsequent cost control and management.

Item Type: Thesis (Doctoral)
Thesis advisor: O'Connor, J T
Uncontrolled Keywords: web-based system; highway; pavement; traffic; computing; cost control; estimating; information system
Index terms: relational database, earthwork, web-based system, computing, prototype, estimating, cost control, cost estimating, information system, estimate, design and construction, computer application
Subjects: software systems, contractual arrangements, information systems, modelling and simulation, data management, digital technology, computing systems, financial and cost management, construction methods
Topics: Digital Applications, Procurement, Cost Management, Engineering Principles
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here