Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.
Abstract
A GPS-based earthmoving system for construction, which is the state-of-the art in earthmoving, was created in 1998 and has continued to be developed since that time. This new technology is currently being applied to many construction fields, bringing many advantages over conventional systems, such as more efficiency, better performance, and safety. As this application of the GPS system has been broadly extended to many jobsites rapidly, planners faced the challenge of determining whether the conventional system or the GPS-based system is more applicable under specific job conditions in the project planning phase. One of the major methods to help them determine this subject is to estimate and compare the productivity of each system, which is a basic criterion for the evaluating performance of construction activities. The problem of accurate assessment of earthmoving productivity has been a typical research subject by many researchers for years that have rendered a wide array of evaluations. However, these studies focused on a single evaluation model, being either a deterministic model or a simulation model. The deterministic model cannot address the random and dynamic nature of earthmoving operations; and although a simulation model can overcome these limitations, the difficulty in implementing simulation has greatly restricted it from being applied widely in the industry. Additionally, there is no current reference for evaluating the productivity of the GPS-based systems because of their new technology state. The goal of the current research is to create and develop an application model for predicting the productivity of the conventional and the GPS-based earthmoving systems using appropriate tools. In the first phase of this research, more precise and reasonable datasets are generated using a simulation methodology, WebCYCLONE, which is conducted based on actual data collected from the selected jobsites using the full factorial experimental design method. The application model based on two decision-making tools (i.e. , a multiple regression model and an artificial neural network) is presented in the second phase to provide appropriate productivity estimations for each different site condition, as well as evaluation of the application model through a case study.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Halpin, D W |
| Uncontrolled Keywords: | efficiency; artificial neural network; earthmoving; productivity; project planning; safety; experiment; multiple regression; neural network; case study; simulation |
| Index terms: | modelling, productivity, estimate, planner, earthmoving, neural network, multiple regression model, estimation, dataset, artificial neural network, project planning, multiple-regression, experiment, methodology, new technology, decision-making, construction activity, case study, efficiency, experimental design |
| Subjects: | analytical methods, research methods, financial and cost management, artificial intelligence, modelling and simulation, construction operations, innovation and technology management, data management, performance management, statistical analysis, profession, decision analysis, research design and methodology, control systems, data collection methods, management |
| Topics: | Quality Management, Roles and Professions, Project Management, Research Practice, Site Management, Risk Management, Digital Applications, Cost Management, Engineering Principles, Business Strategy |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here