Abstract

The process of contractor selection, such as contractor prequalification, is an important part of a project procurement life cycle in order to reduce risks from irresponsible or incompetent contractors and find appropriate and responsible contractors that can perform project tasks to the expected project performance requirements and client satisfaction. Periodic prequalification, a type of prequalification system, is commonly used to assess contractors' competence in the construction industry in order to develop a standing list of contractors relevant for a certain periodic time frame including a certain project size, range and type, which can be used by a client for short listing or invitation to bid. In order to investigate the relationship between periodic prequalification criteria and project performance, a literature review and two questionnaire surveys in the UK construction industry, followed by statistical analyses, were undertaken. The first stage is to identify the characteristics of periodic and project prequalification in order to develop appropriate periodic prequalification criteria for the next stage of the identification of periodic prequalification factors influencing project performance. Data obtained from the first questionnaire survey were obtained from client firms/organisations and construction firms in the UK construction industry, while the second survey elicited data from UK local authorities. Through the application of Factor Analysis and Logistic Regression techniques, it was found that the past experience factor in relation to contractual experience with similar project value and type, as well business age, and the managerial and technical strength factor in respect of subcontractor relationships and competence, and also training schemes, are the periodic prequalification factors, along with sources of variation factor, namely, client and neither party factors, which may influence project time performance. In this case, additional work/cost due to unforeseen circumstances and changes with regards to design, contract or specification are causal factors of variation with regards to the client factor, while unforeseen circumstances and inclement weather are sources of variation factors under the neither party category. Moreover, client satisfaction is influenced by both past experience and client factors as a source of time variation.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: competence; construction firms; client satisfaction; contractor selection; life cycle; prequalification; training; client; subcontractor; UK; factor analysis; project performance; weather; questionnaire survey
Index terms: local authority, literature review, survey, construction firm, specification, subcontractor, project procurement, weather, competence, variation, time performance, questionnaire, life cycle, statistical analysis, contractor selection, logistic regression, modelling, construction industry, client satisfaction, project performance, factor analysis
Subjects: client relations, organization, air quality, data collection methods, practitioner, value management, analytical methods, data analysis and analytics, contractual arrangements, data science, tendering, personnel development, project management theory and practice, contractual condition, sociology, project controls, statistical analysis, industry analysis
Topics: Sustainability, Procurement, Engineering Principles, Project Management, Contract Administration, Time Control, Human Resources, Stakeholder Management, Roles and Professions, Research Practice, Business Strategy
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here