Service life estimation in building design: A development of the factor method

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Abstract

The built environment usually constitutes a very important part of the real capital of a nation, and the construction sector represents more than 10% of the yearly Gross National Product of the industrialised world. Good planning of all construction is important, and consideration of the service life of the work is of great interest and is a significant aspect of sustainability considerations. The need for more knowledge about degradation of materials, for structured methodology, and for working tools for those involved in the planning process, has resulted in an extensive effort in pre-normative research and standardisation regarding this field. This thesis presents a discussion on service life planning and the role of the Factor Method in such work, and especially, discussion of modification and development of the methodology. In the design process, the need to evaluate the service life of products is a great challenge, as the results will depend on both material properties and the environment in which the material is placed or used. A practical solution has to be based on a good knowledge in the field, but also on a sound working strategy, to ensure that different design scenarios can be compared in a standardised or structured way. The Factor Method is a promising working tool for such an evaluation and comparison, but is as such, still more of a methodology, than a method. Examples of the use of the methodology are still very limited, and the method as such, is much discussed by researchers. However, its future will depend upon how practical it will be to apply in use. The method is useful to estimate the service life of products, based on a known reference service life and a number of modifying factors. These factors in turn depend on the conditional differences between the specific project and the reference, in-use conditions. This thesis discusses the required precision of such a methodology, especially in light of inherent distributions in material properties, and the fact that the consequences of failure are often very limited. In such cases, the standardised Factor Method is considered to be quite useful, and should give the parties involved a good means for working in a structured and systematic way.

Item Type: Thesis (Doctoral)
Thesis advisor: Sjöström, C
Uncontrolled Keywords: built environment; construction sector; evaluation; service life; design process; failure; sustainability
Index terms: construction sector, methodology, strategy, design process, material property, estimate, built environment, standardization, estimation, degradation, planning process, building design, service life
Subjects: research methods, management, performance measurement, material properties and characteristics, asset management, project controls, industry analysis, infrastructure and transport systems, design methods, financial and cost management, architectural design, material degradation and durability
Topics: Quality Management, Business Strategy, Cost Management, Construction Materials, Research Practice, Urban Studies, Design Practice, Time Control
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here