Optimisation of preventative maintenance strategies for reinforced concrete bridges

Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. PhD thesis, University of Surrey, UK.

Abstract

Bridge structures have a vital role to play in the transport system.   Unfortunately, like all engineering structures they are constantly deteriorating with time due to various causes such as metallic corrosion.   A well-planned and implemented maintenance program can help to secure maximum service life at an acceptable cost.   Preventative maintenance (PM) measures can often help to prevent, or postpone, the onset and progress of deterioration.   However, there are currently significant uncertainties associated with the need for these maintenance actions and their degree of effectiveness.   The aim of this project is to develop a methodology, which will set a basis for finding optimum PM strategies while incorporating the uncertainty of their effectiveness. A review study was undertaken first to study the state of the art in the area of bridge maintenance management particularly in the UK and optimisation techniques.   Based on the findings of this study a probabilistic procedure has been developed to incorporate the uncertainties and estimate the effectiveness of various PM measures by producing probability of failure (pf) profiles related to the initiation of corrosion.   To link the pf profiles of PM with their cost, and produce optimum PM strategies, an optimisation methodology using the principle of Genetic Algorithm (GA) has been developed.   A spreadsheet - program was created using Excel XP and Visual Basic Programming 6 (VBA 6), to demonstrate the methodology and enable analyses to be performed efficiently.   This provides a tool capable of identifying optimum PM strategies for Reinforced Concrete (RC) bridges, by delaying the onset of, or stopping, the corrosion process due to the ingress of chloride based de-icing salt.   Sensitivities studies were also performed to identify significant trends and assess the relative importance of the various parameters involved. The results are promising since optimum PM strategies can be produced even though these are dependent on the input data.   In order to produce more realistic strategies and apply this methodology effectively, there is a need to enhance the quantity and quality of the available data.   It is concluded that, these strategies can be used as an aid to gain better insight into the effectiveness of PM measures, and their use in planning the protection of bridge element from chloride ingress.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: failure; optimisation; uncertainty; reinforced concrete; corrosion; deterioration; maintenance management; programming; service life; UK; probability
Index terms: maintenance management, spreadsheet, optimization technique, service life, effectiveness, estimate, relative importance, deterioration, genetic algorithm, strategy, program, methodology, reinforced concrete, programming, state of the art, corrosion
Subjects: asset management, performance management, maintenance engineering, research methods, software systems, algorithms, management, building materials, material degradation and durability, financial and cost management, data science, risk assessment, research dissemination and communication, programming
Topics: Risk Management, Quality Management, Research Practice, Construction Materials, Business Strategy, Cost Management, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here