ICT-enabled collaborative working methodologies in construction

Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. EngD thesis, Loughborough University, UK.

Abstract

Since the turn of the new millennium the UK construction industry has witnessed the naissance of a new paradigm known as ICT-enabled collaborative working. Advocates of this new approach believe that the adoption of ICTs will lead to better project information exchange, communications, integrated processes and therefore more efficient collaborative working. It is expected that ICT-enabled collaborative working will not only overcome the industry’s many inherent problems, such as its adversarial and fragmented nature, but that it will also facilitate benefits for all involved. This supposition is based upon the recognition that its exploitation has proven successful at transforming other industries. The EngD thesis pertains to a four-year study on two methodologies currently applied under the concept of ICT-enabled collaborative working, 'Collaborative Prototyping' (CP) and the use of 'Construction Project Extranets' (CPE). The research project utilised literature reviews, case studies, project observations, active involvement, surveys, interviews and workshops to develop expertise and knowledge within the subject area. It shows that a large disparity exists between the use of a shared 3D model and the use of CPEs to promote collaborative working. Conversely, whilst CPEs have become the de facto ICT-enabled approach to seeking improvements in project efficiency (due to their potential to enhance communications, integration and collaboration) they are not being utilised effectively. This was attributed to the use of inadequate procedures that fail to provide proper consideration of all the necessary issues to ensure successful implementation, application and management of the CPE. As a result, project teams are failing to ascertain the full potential benefits offered by such collaboration tools. The research demonstrates that to overcome this, project teams require the development of an industry best-fit framework that defines proficient procedures. It highlights the main factors for inclusion within a protocol. Furthermore, it provides a simple form to promote greater awareness of the key factors that impinge on the successful application of CPE. The thesis concludes by outlining a number of recommendations for consideration by the industry, along with requirements for future work.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: communication; construction project; case studies; interview; workshops; UK
Index terms: workshop, case study, efficiency, exploitation, 3D model, paradigm, project team, disparity, implementation, construction industry, interview, information exchange, survey, literature review, collaboration, construction project, integration, prototyping, methodology
Subjects: project delivery, innovation and technology management, data science, contractual arrangements, data analysis and analytics, computational design, data collection methods, construction type, industry analysis, social justice, organizational analysis, production management, research methods, performance management, management, education and knowledge transfer
Topics: Research Practice, Business Strategy, Construction Technology, Digital Applications, Organizational Design, Project Management, Engineering Principles, Procurement, Quality Management, Ethics
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here