A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Abstract

To improve quality and reduce the overall costs, in recent years, many state highway agencies have started investigating innovative contracting methods, such as performance-based warranty contracting. This contracting method is structured to shift the performance-related risk from the agency to the contractor, by means of warranty provision. Even though the application of performance-based warranty contracting methods allows for a “win-win” situation, where agencies hedge the performance-related risk, and contractors have more flexibility in the design and construction processes, there are many concerns with its implementation. One of the most important concerns is how to quantify the risk cost. This dissertation is focused on the development of a robust and flexible methodological framework for quantifying the risk cost associated with warranty specifications for transportation infrastructure. The key components of this framework for studying performance warranties include: characterization of the warranty systems, development of probabilistic performance models based on the method of moments, formulation of the risk cost quantification models, and formulation of the models for determining the optimal design strategy and maintenance schedule. In this dissertation, three types of warranty systems are characterized and elaborated upon in detail: short-term, long-term, and maintenance performance warranties. To test the accuracy of the method of moments for developing reliability functions, the current AASHTO method for design of pavements is employed to provide a case study. The results from the comparison analysis of the methods of moments with Monte Carlo simulation indicate that the method of moments yields accurate predictions of the failure probabilities; in general, the quality of estimation improves as the order of the central moments in reliability indices increases. Finally, the methodology is illustrated with numerical examples to show that models for quantifying the risk cost associated with warranty specifications can be developed.

Item Type: Thesis (Doctoral)
Thesis advisor: Zhang, Z
Uncontrolled Keywords: accuracy; contracting methods; failure; flexibility; liability; reliability; highway; pavement; specifications; quantification; case study; Monte Carlo simulation; simulation
Index terms: quantification, case study, Monte Carlo simulation, estimation, transportation infrastructure, warranty, design and construction, modelling, implementation, dissertation, liability, design strategy, specification, accuracy, methodology, contracting method, agency, performance-based
Subjects: data collection methods, research dissemination and communication, design methods, modelling and simulation, financial and cost management, analytical methods, contractual arrangements, research methods, performance measurement, professional development, contractual condition, sociology, measurement and scaling, liability law, infrastructure and transport systems
Topics: Design Practice, Contract Administration, Information Management, Research Practice, Cost Management, Quality Management, Legal Issues, Engineering Principles, Procurement
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here