Forecasting elemental building cost percentages using regression analysis and neural network techniques

Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.

Abstract

Early stage project estimates are a key component in business decision making, and generally form the basis of the project's ultimate funding. Their strategic importance has been long recognised, leading to increased research and development in cost modelling. For example, research initiated at The University of Manchester resulted in the production of ProCost - early stage cost estimating software, which has the ability to forecast the total cost of a proposed building in the form of a single figure output. This research project commenced with a nationwide questionnaire survey of current cost modelling and elemental cost estimating practice. One of its major findings was that quantity surveyors are not satisfied with single figure output cost models. Based on this, an investigation into the feasibility of generating an elemental breakdown of the ProCost output was initiated. An investigation into an appropriate elemental output format resulted in the adoption of 17 elements based on the Royal Institution of Chartered Surveyors (RICS) Standard Form of Cost Analysis (SFCA). Models were created for each of these elements using both multiple linear regression and artificial neural network (ANNs) techniques. Initially, data from 120 office buildings were collected and modelled using multiple linear regression analysis. The accuracy of these models, as measured by the mean absolute percentage error (MAPE), ranged from 9.2% to 319.6%. Recognising the deficiency of some of these models, the study proceeded by using ANNs as an alternative modelling method. Accepting the requirement of this method for increased data cases, a second data collection programme was initiated, extending the database to industrial and residential buildings and resulting in a total of 360 projects. ANN produced superior models for the majority of the elements, generating MAPEs from 9.7% to 43%. The final decision support tool presented is a hybrid of these two methods with 5 of the models based on multiple linear regression and 12 on ANN techniques. The mean MAPE of the 17 models is 22.1%. The model compares favourably against previous cost modelling attempts in terms of accuracy, generalisation, sample size, and application spectrum and flexibility. It is anticipated that its utilisation will improve current practice enabling quantity surveyors (cost estimators) to generate quick elemental estimates at an early design stage. Further its elemental character will introduce a crosschecking mechanism into the decision-making process, increasing user confidence in the model's application.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: accuracy; artificial neural network; cost estimating; cost modelling; decision making; decision support; estimating; funding; neural network; quantity survey; quantity surveyor; questionnaire survey; regression analysis; residential; s
Index terms: estimating, questionnaire, cost model, research and development, Royal Institution of Chartered Surveyors, decision-making, artificial neural network, programme, survey, accuracy, neural network, decision support, cost estimating, cost analysis, regression analysis, cost estimator, early design stage, modelling, estimate, investigation, funding, office building, database, sample size, decision-making process, forecasting, residential building, quantity surveying
Subjects: design process, professional development, statistical analysis, research management, decision analysis, data management, project controls, research design and methodology, profession, construction type, data collection methods, economic analysis, prediction and forecasting, analytical methods, financial and cost management, artificial intelligence, professional institution, modelling and simulation
Topics: Time Control, Design Practice, Digital Applications, Construction Technology, Roles and Professions, Research Practice, Information Management, Business Strategy, Cost Management, Risk Management, Engineering Principles
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here