Information flow to support front end planning

George, R (2007) Information flow to support front end planning. PhD thesis, Clemson University, USA.

Abstract

Previous research has demonstrated the value of front end planning as it impacts project performance. This dissertation summarizes the findings of a research project which examined ways to improve information flow through the front end planning process. The front end planning process was carefully diagrammed as consisting of 33 distinct information flow activities, each with its own information flow entities and interactions. Fifty-one questionnaire survey forms were analyzed to obtain data for the 33 information flow activities that included activity duration, resources expended, and other supplemental insights such as the extent of information availability. The 51 projects were then grouped into successful and less successful categories based on several criteria to determine if the two groups had any significant differences in how they executed front end planning. An analysis of the data concluded that successful projects often spent more time and utilized more resources on the front end planning process. An additional product of the research provided the information requirements for each activity. Information flow tables were also created for each activity. This dissertation provides general recommendations and insights for stimulating proactive actions during the front end planning process, each designed to improve the flow of information and increase the likelihood of project success.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: duration; project performance; questionnaire survey
Index terms: questionnaire, survey, information flow, interaction, duration, dissertation, project performance, planning process, project success
Subjects: data collection methods, research dissemination and communication, project management theory and practice, project controls, information systems, behavioral psychology
Topics: Research Practice, Time Control, Digital Applications, Project Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here