Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Abstract
The skills required of construction craftsmen are determined by factors related to their work environment such as the prevailing technology, materials and methods of work, and their employment relationships. As these factors change over time, it follows that the skill sets of the craftsmen will also change. An argument put forward by several writers is that the traditional classes of skills are inadequate to cope with the range of work required in today’s construction sector. In addition, these changes, which create new knowledge, skills and attitudes that the craftsman requires for adequate work performance, highlights the crucial role of training in ensuring that the craftsmen are equipped with the appropriate skills. The Kenyan construction sector has experienced dramatic changes in the work environment of craftsmen over the last 20 years, driven mainly by the decline of the formal sector, the increased casualisation of operatives, and the growth of informal procurement. This has arguable led to equally significant changes in the nature of and demand for crafts skills. This paper reports on the findings of a pilot study that sought to investigate the type of skills that Kenyan craftsmen are acquiring. The results show that, in addition to the traditional trade skills, the craftsmen are acquiring generic skills e.g. material specification, estimation, supervision and costing. These new skills are driven mainly by changing employment relationships, particularly between the craftsmen and employers utilising informal procurement rather than the skills required by the formal construction sector. Consequently, the changing skills requirement among craftsmen highlights the need to overhaul the existing training programmes to meet the changing needs of the construction sector.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | craftsmen; Kenya; skills; training |
| Index terms: | costing, construction sector, craft worker, work performance, Kenya, supervision, operative, work environment, employment, programme, estimation, craft skill, specification |
| Subjects: | industry analysis, project controls, contractual condition, Geography, management, accounting and finance, financial and cost management, operations management, control systems, practitioner |
| Topics: | Organizational Design, Contract Administration, Time Control, Human Resources, Roles and Professions, Cost Management, Project Management, Geographical Context, Research Practice |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here