Integration of construction process documents into building information modeling

Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.

Abstract

The work discusses the integration of construction process documents into the Building Information Modeling (BIM). The different phases of the building lifecycle include planning, design, construction, maintenance, and decommissioning. Existing practices facilitate the implementation of BIM only up to the early stages of the construction phase. This is partially due to absence of three dimensional (3D) as-built model and lack of integration of the construction process documents into model. The objective of this research is to extend implementation of the BIM by creating a 3D as-built model, a four dimensional (4D = 3D + time) as-built model, and attaching the construction process information to the model for use during the maintenance and decommissioning phase of the lifecycle. The accomplishment of the research objective was demonstrated through a real time construction project using commercially available BIM software products of three vendors. They are Autodesk, Bentley, and Graphisoft. The methodology adopted for developing a 3D as-built model included using the "objective-driven data acquisition" technique. This involved using a custom built robotic laser rangefinder mounted on a pan and tilt unit and a robotic total station for the data acquisition of as-built components. The development of the 4D as-built model, and attaching the construction process information to the 3D as-built model involved programming in C, C++, Visual Basic (VB), JScape object Model (JSM), and Geometrical Descriptive Language (GDL). The results indicated that the three vendors' BIM products are not specifically prepared to accomplish the research objective but are adaptable with some programming. The amount of work required for BIM implementation varies depending on the vendor's product. However, further research investigations and software developments are needed to reduce the amount of work required for BIM implementation.

Item Type: Thesis (Doctoral)
Thesis advisor: Goedert, J D
Uncontrolled Keywords: as-built model; construction project; building information model; building information modeling; construction phase; decommissioning; integration; lifecycle; programming
Index terms: software development, documents, programming, methodology, as-built model, integration, construction process, construction project, building information modelling, data acquisition, decommissioning, implementation, construction phase, lifecycle, investigation, real time
Subjects: technical documentation, project delivery, contractual arrangements, data collection methods, programming, building construction, organizational analysis, project controls, information systems, research methods, software systems, renovation and retrofit, professional development, production management
Topics: Procurement, Project Management, Engineering Principles, Site Management, Organizational Design, Time Control, Design Practice, Digital Applications, Research Practice, Information Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here