A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment

Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.

Abstract

Projects are commonly over budget and behind schedule, to some extent because uncertainties are not accounted for in cost and schedule estimates. Research and practice is now addressing this problem, often by using Monte Carlo methods to simulate the effect of variances in work package costs and durations on total cost and date of completion. However, many such project risk approaches ignore the large impact of probabilistic correlation on work package cost and duration predictions. This dissertation presents a risk analysis methodology that integrates schedule and cost uncertainties considering the effect of correlations. Current approaches deal with correlation typically by using a correlation matrix in input parameters. This is conceptually correct, but the number of correlation coefficients to be estimated grows combinatorially with the number of variables. Moreover, if historical data are unavailable, the analyst is forced to elicit values for both the variances and the correlations from expert opinion. Most experts are not trained in probability and have difficulty quantifying correlations. An alternative is the integration of Bayesian belief networks (BBN's) within an integrated cost-schedule Monte Carlo simulation (MCS) model. BBN's can be used to implicitly generate dependency among risk factors and to examine non-additive impacts. The MCS is used to model independent events, which are propagated through BBN's to assess dependent posterior probabilities of cost and time to completion. BBN's can also include qualitative considerations and project characteristics when soft evidence is acquired. The approach builds on emerging methods of systems reliability.

Item Type: Thesis (Doctoral)
Thesis advisor: Baecher, G B
Uncontrolled Keywords: duration; integration; risk analysis; Bayesian belief network; probability; risk analysis; Monte Carlo simulation; simulation
Index terms: risk factor, project risk analysis, duration, estimate, dissertation, package, variance, Monte Carlo simulation, evidence, methodology, integration, risk analysis, bayesian belief network
Subjects: contractual arrangements, financial and cost management, modelling and simulation, research dissemination and communication, evaluation and assessment methods, environmental hazards, project controls, organizational analysis, measurement and scaling, probabilistic model, financial risk, research methods
Topics: Digital Applications, Organizational Design, Time Control, Research Practice, Cost Management, Procurement, Sustainability
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here