Framework for minimising time overruns of Malaysian construction projects

Endut, I R (2008) Framework for minimising time overruns of Malaysian construction projects. PhD thesis, Glasgow Caledonian University, UK.

Abstract

Malaysia is a fast developing country in the Asian region which has undergone rapid growth since the 1970s. The construction industry is an important sector in socialeconomic development. It is generally understood that construction project delivery in Malaysia frequently experiences cost and time overruns, leading to many being completed at excessive cost and time overrun, or, in some situations, abandoned. The overall aim of the study, therefore, was to develop a framework to proactively minimise time overrun in Malaysian construction projects. This aim was fulfilled by achieving research objectives, including an investigation of the factors that contribute to time overruns, the relationship between the time and cost of construction projects, and to compare the factors related to time overrun in the 'best' and 'worst' Malaysian construction projects. A four-stage approach was adopted for the study. The quantitative data sets obtained were subjected to a rigorous statistical analysis. The main limitation of this research was due to a low response rate from the respondents. The personal contact with the respondents was used to'increase the response rate in all questionnaire surveys. The study concluded that there is a need to develop a framework for minimising time overrun in Malaysian construction projects. The results from the four stages were found suitable for further use in framework development. From the 84 time overrun factors investigated, 37 significant factors were determined, which were focused on for framework development. The research proceeded to develop a comprehensive framework to minimise time overrun, followed by several mitigation measures being suggested for each of the factors. The use of professionals and experts in the construction industry helped to identify the effectiveness and practicality of the mitigation measures for each factor. The framework came together with the risk management strategy for a construction project. It is anticipated that the framework will encourage the construction industry to understand the importance of minimising time overrun, as well as assisting and enabling the clients, consultants, contractors and others parties involved in construction projects. It is hoped that this will lead to future improvements in the Malaysian construction industry, through a continuous culture of improvement in the industry, and act as a vehicle for change within the industry, which is required to assist in improving current standard practices in delivering construction projects of better quality that fulfill client satisfaction and minimise time overrun.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: client satisfaction; developing country; economic development; Malaysia; questionnaire survey; risk management; statistical analysis
Index terms: economic development, developing country, strategy, construction project delivery, survey, construction project, mitigation, questionnaire, Malaysia, time overrun, framework development, statistical analysis, effectiveness, investigation, risk management, client satisfaction, construction industry
Subjects: contractual arrangements, data science, client relations, risk assessment, data collection methods, project controls, industry analysis, performance management, economic development, management, financial risk, development economics, Geography, production management
Topics: International Construction, Time Control, Research Practice, Cost Management, Business Strategy, Stakeholder Management, Quality Management, Project Management, Geographical Context, Procurement, Sustainability, Risk Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here